...UGAAA just held a conference call....New IPF is OFFICIAL
Groundbreaking will be in December....Hopes to have it completed by the 2017 calendar year
Renderings have been given.....Board of Regents has reviewed and approved.....So did the UGA...
Apprx time of completion will be determined after meeting with construction management firm
Building will be 80 wide, 140 long, 65 feet high, from exterior, 75 feet high.....
Cost for the new facility is $30.2 million....$15.1 million from cash reserves with 15.1 million coming from fundraising.
A 60-meter track will also be installed and used as a runway for field events, triple jump, etc
Baseball batting cages will also be installed
Is being a called a 50-100 year facility
McGarity said no shortcuts will be taken
Groundbreaking will be in December....Hopes to have it completed by the 2017 calendar year
Renderings have been given.....Board of Regents has reviewed and approved.....So did the UGA...
Apprx time of completion will be determined after meeting with construction management firm
Building will be 80 wide, 140 long, 65 feet high, from exterior, 75 feet high.....
Cost for the new facility is $30.2 million....$15.1 million from cash reserves with 15.1 million coming from fundraising.
A 60-meter track will also be installed and used as a runway for field events, triple jump, etc
Baseball batting cages will also be installed
Is being a called a 50-100 year facility
McGarity said no shortcuts will be taken